Slab cut plans and quoting for stone and countertop shops
Jumbo quartz, granite and sintered stone slabs on bridge saws and CNCs.
Stock format: 2 | Net yield: 71.85 %View cut plan (2)
Cut settings: trim and kerf 3/4 / 3/16 in
One-click samples
One part per line: ID; width; length; qty; grain 1/0One part per line: ID; length; qty
Repeatable heuristic: the result does not guarantee the best possible yield. No registration. Up to 60 pieces and 2 materials per calculation.
Loaded perimeter run, island and 4 in splashes with vein lock on 126 x 63 in slabs: 2 slabs (37.49 % gross yield, 71.85 % net yield). Compare net remnant pricing ($480.03) against full-slab billing ($920.00) before sending.
Stock format
2
Gross yield
37.49 %
Net yield
71.85 %
Cost
$480.03
- Part
- Reusable offcut
- Scrap
Charge full stock formats: $920.00
Common margin leaks in this trade
- Quoting strict square footage when an island forces a second jumbo slab in a non-stock color.
- Rotating a veined backsplash strip 90 degrees so it clashes with the deck.
- Ignoring 3/4 in factory perimeter trim and resin mesh edges on sintered slabs.
- Cutting sink and cooktop locations before the homeowner or builder signs the shop drawing.
Batch setup quote calculator
| Quantity | setup | Unit price | Total |
|---|---|---|---|
| 1 | $76.67 | $973.83 | $973.83 |
| 10 | $7.67 | $858.83 | $8,588.30 |
| 50 | $1.53 | $848.61 | $42,430.50 |
FAQ
How do we choose between remnant stock pricing and full slabs?
Both numbers appear side by side: charge $480.03 when keeping usable white quartz remnants, or $920.00 to cover all 2 slabs on special-order stone.
Does the layout account for bridge-saw blade kerf and slab trim?
Yes: 3/4 in perimeter trim is removed first and a 3/16 in saw kerf separates every guillotine cut.
Are vein-matched pieces prevented from rotating?
Every piece marked grain locked stays in its exact orientation across all six passes.