Press brake setup sets the price of short runs
Changing punch and die, setting the back gauge and bending a first test part takes about 20 minutes before the first good hit. On a 2 bend bracket that setup is almost the whole bending cost for a single part and only a third of it on a run of 100.
| Run size | Press brake / part, 2 bends | Cost / part, 2 bends | Press brake / part, 4 bends | Cost / part, 4 bends |
|---|---|---|---|---|
| 1 | $25.50 | $50.66 | $26.00 | $51.16 |
| 5 | $5.50 | $13.96 | $6.00 | $14.46 |
| 20 | $1.75 | $7.08 | $2.25 | $7.58 |
| 100 | $0.75 | $5.25 | $1.25 | $5.75 |
- Count press brake hits per part: every bend is a hit, and bends that need a tool change count on their own.
- Measure real setup: punch and die change, back gauge setting and a test part.
- Time the seconds per hit including handling; 10 to 15 s is common on mid size parts.
- Compare a run of 1 with a run of 20 before quoting: the difference per part is setup spread over the run.
FAQ
Why does a flat part carry no press brake cost?
With no bends there is no tool change and no hits, so the calculation keeps the press brake at zero even if a setup time is entered.
How many parts does it take to dilute setup?
With 20 minutes of setup and 12 s per hit, hit time equals setup time at 25 parts with 4 bends and at 50 parts with 2 bends.