When to charge full stock sheets versus net consumption
Spilling onto sheet two for a single panel creates a classic quoting dilemma: billing two full sheets on everyday birch plywood can lose the bid, while billing net area on custom-ordered laminate leaves your cash tied up in dead rack remnants.
| Job profile | Sheets | Net yield | Stock policy cost | Full-sheet cost |
|---|---|---|---|---|
| 2 large doors (low fill on sheet 2) | 1 | 83.04 % | $53.01 | $78.00 |
| 9 cabinet parts (balanced 2 sheets) | 1 | 76.80 % | $65.51 | $78.00 |
| 14 shelf parts (tight fill) | 2 | 80.64 % | $124.77 | $156.00 |
- Set a realistic minimum reusable offcut size that your sawyers actually pull from the rack (for example 12 x 12 in or 20 in bar).
- Any remainder smaller than that threshold is scrap and is always paid by the current job.
- Choose stock policy on fast-moving white melamine, raw MDF, mild steel and clear acrylic.
- Choose full-format billing on special-order veneers, custom colors, exotic stone or non-stock gauges.
FAQ
Does stock policy ever make the shop eat non-reusable kerf and trim?
No. Trim, kerf and undersized drops stay inside net consumed area; only rectangles meeting your minimum offcut dimensions are credited back.
When are child offcut rows created in inventory?
Strictly when the job transitions to cut, never while a quote is still pending approval.